Menu
Shot BlastingLine RemovalDock & RampGaragesCleaningWarehouses & Distribution CentersFloor Care PlansLease Move-Out FloorsFor ContractorsOur WorkService AreaFree DownloadsFAQRequest a written proposal
Call 817-600-8452

BlastTex / Warehouses & distribution centers

Warehouse and Distribution Center Floors, Prepared Around Your Operation

Line removal, dock and ramp restoration, coating preparation and industrial cleaning.

Facilities cannot always shut down for floor work. BlastTex plans phased work zones, nights, weekends and shutdown windows so your docks keep moving, and we bring our own machines, power and HEPA dust collection.

Commercial site walks are free within 50 miles of Hurst. Farther out, see our travel zones.

14,000 linear ft removed in one active Irving warehouseCGL insured; COI on requestNights and weekends
New yellow forklift lanes in front of warehouse dock doors on concrete BlastTex prepared in Irving, TX

What we handle for facilities

Layout changes

Reconfiguration and restriping

  • Old forklift lanes, walkways and bay markings removed
  • Stripe paths and bay pads blasted for the new layout
  • Ready for your striping contractor
From $2,500Line removal →

Docks and ramps

Rubber, fluid and worn texture

  • Buildup removed by sweeping, scrubbing and shot blasting
  • Texture restored; scarifying where needed
  • Work zones planned around trucks
From $2,500Dock & ramp restoration →

New coatings

Epoxy, polyaspartic or sealer projects

  • Old coatings and sealers removed
  • Shot blasted to the specified CSP, with a test area when needed and the profile checked against ICRI reference chips
  • Coordinated with your coating contractor
From $2,500Shot blasting →

Cleaning and maintenance

Dust, tire marks and grime

  • Ride-on sweeping and scrubbing
  • Floor Care Plans on a set schedule
  • Priced below one-time cleaning
From $1,500Floor Care Plans →

Tenant turnover

Lease move-outs and make-ready

  • Markings and buildup removed
  • Floor scrubbed, docks cleaned
  • Photo report for the walkthrough
  • 200,000 sq ft cleaned for one Grand Prairie turnover
From $1,500Move-out floors →

Every project includes: a written scope and payment schedule · our own power and HEPA dust collection · the Time-Stamped Photo Report · one point of contact from proposal to completion.

Built to work around operations

How we plan the work

  • Phased work zones around forklift and foot traffic
  • Taped-off safety zones while blasting
  • Nights, weekends and shutdown windows
  • Your check-in process, PPE and site rules followed
  • Company-owned generator when building power is not available

Scope and limitations

  • Oil that has penetrated deep into the slab may remain
  • Faint shadows of old markings may remain after removal
  • Crack repair, moisture testing and degreasing are handled by partner companies
  • BlastTex does not test or certify slip resistance, OSHA or ADA compliance

Case study: Irving distribution warehouse

Worn forklift and pedestrian lines on a distribution warehouse floor in Irving, TX
Before: worn forklift and pedestrian lines
Shot blaster and dust extractor removing lines in an active distribution warehouse
During: removal in taped-off zones
New forklift lanes in front of dock doors after shot blasting and restriping
After: new lanes by the striping contractor

14,000 linear feet of forklift and pedestrian lines removed while trucks and forklifts kept moving. The striping contractor followed, and the warehouse kept operating. See the full project →

How it works

  1. Site walk or photos

    A free site walk within 50 miles of Hurst, or send photos, square footage and operating hours.

  2. Written proposal

    Scope, schedule and payment terms in writing within 24–48 hours of the walk.

  3. Phased work

    Scheduled around your operation, including nights and weekends.

  4. Photo report

    Time-stamped documentation for your facility records.

Facility questions

Can you work while our warehouse is operating?

Yes. We plan phased work zones around forklift and foot traffic, tape off safety zones, and work nights, weekends or during shutdown windows. Tell us your operating hours, and we will build the schedule around them.

Do you follow our site safety and contractor requirements?

Yes. We follow your check-in process, PPE requirements and site rules. A certificate of insurance and W-9 are available on request. Using a vendor system such as ISNetworld or Avetta? Tell us which one when you request a proposal.

How large a floor can you handle?

We run a ride-on shot blaster for large open floors, two walk-behind blasters for aisles and tight areas, a ride-on sweeper, multiple battery-powered and diesel ride-on scrubbers and walk-behind scrubbers, and we phase large projects across several shifts. Production always depends on the condition of the floor, the layout of the project, obstacles, the coating being removed and the profile required.

Do you offer degreasing?

No. Chemical degreasing produces regulated wastewater, so BlastTex does not perform it. When a floor needs full degreasing, a specialized cleaning company handles that step, and we schedule our work immediately after.

How is payment handled?

Every proposal includes a project-specific payment schedule. Depending on project size and scope, a mobilization payment and progress billing may apply. Approved commercial accounts may qualify for established billing terms after a credit review.

See all questions →

Planning floor work at your facility?

Send photos, approximate square footage, the location and your operating hours, and we will schedule a site walk or send a written proposal. Free checklist: Scrub It or Blast It? →

CallText photos